People in the Republic of China start by building a top power

Chapter 367



Chapter 367

Su Yun looked up and saw signs that said “foundation is under construction, pay attention to safety” near the construction site. Inside the construction site, many workers were still working closely.

Su Yun asked, “Where are those employees now?”

Zhao Lin replied: “Mr. Su, the employees of the agricultural machinery company are currently working in the headquarters, and the rest of the lower-level employees are receiving training.

They will move in one after another when it is completed. ”

“I see, the arrangement is good.”

Su Yun nodded and said, and then he instructed: “People must pay attention here, and the training of those employees must be more serious, people take food as their priority, and there must be no problems in agriculture.

I don’t want to see the slightest glitch in the machines that our company sends out in the future! ”

“I remember, Mr. Su!”

Zhao Lin solemnly agreed.

He knows that Su Yun has always been a rigorous person, not only in the agricultural machinery company, but in everything in the company, Su Yun strives to be perfect and does not allow any perfunctory.

Su Yun nodded slightly, Su Yun still recognized Zhao Lin’s ability very much.

Since the current Agricultural Machinery 4.2 Machinery Company is laying the foundation, construction is everywhere on the site, and it is difficult for the two of them to enter. Su Yun does not want to delay the progress of the workers because of his arrival.

After the two visited the periphery for a while, Su Yun and Zhao Lin walked to other places.

During the process, Zhao Lin suddenly remembered something: “By the way, Mr. Su, I have something to tell you. Currently, the number of employees in the company’s headquarters is increasing, and the original size of the headquarters is about to reach its limit.

In the future, the company should recruit more employees, so I think the company headquarters needs to be expanded, and I would like to ask President Su to go back and think about it. ”

Su Yun also frowned slightly.

He had felt this question before.

With the development and expansion of Huayin Company, there are currently more than 1,000 employees in the company’s headquarters. Thousands of employees gather in one building to work, which is indeed a bit overloaded.

Chapter 361: The New Corporate Headquarters

“Well, that is indeed a problem.”

Su Yun remembered the current state of the company’s headquarters, and replied in a thoughtful manner.

Zhao Lin reminded Su Yun to avoid the smoke and dust flying from the construction site, and then added: “There are too many employees in the company headquarters, which affects the efficiency of work many times.

You may not usually pay attention to this in your own office, but I see that many employees are always busy with people when they are in the office, which greatly affects the working environment.

I have asked some people, and they said that there are always people around to shout and do things, which really affects the concentration, but those employees can’t do anything about it.

The current situation is that there are too many things up and down in our company. When the number of employees at the headquarters is not enough, the headquarters itself also has the problem of insufficient space. ”

Zhao Lin said this and looked at Su Yun very seriously.

Su Yun is usually in charge of all major external affairs of the company. As the company’s deputy, he naturally has to pay more attention to some internal problems.

Su Yun thought while walking: “Okay, I know about this. After I go back, I will consider the expansion of the company’s headquarters.”

Su Yun still has to seriously consider Zhao Lin’s words.

A reasonable and comfortable working environment, 09 is the premise for employees to ensure work quality and efficiency.

In his previous life, Su Yun had seen some companies where the working environment was very bad. Employees were working on their posts, and there were always people walking around and making noises.

Therefore, Su Yun did not hope that the headquarters of Huayin Company would become a vegetable market-like place.

This problem must be resolved as soon as possible!

Su Yun decided to find Zhao Qingshan after he went back, and asked him to lead someone to build a new company headquarters as soon as possible.

After walking around the new district with Zhao Lin, the two got in the car and returned to the company headquarters.

When going upstairs, Su Yun paid special attention to it, and found that it was as Zhao Lin said, the employees up and down the company were busy, and it was easy to disturb others.

“Zhao Lin, your observation this time is quite good. Later, you will notify Zhao Qingshan to come to my office, and I will explain some things to him.”

“Understood, Mr. Su.”

The two returned to their offices, and after a while, there was a knock on the door.

“Come in!”

Su Yun didn’t lift his head, he was thinking about how to rebuild the company headquarters.

After Zhao Qingshan entered the door, he respectfully said, “Mr. Su, look for me.”

Su Yun nodded: “How is the situation at the construction company now, are there any extra manpower and equipment?”

Zhao Qingshan replied: “There are many projects under construction in the company, and manpower is needed everywhere, and there are not many people who can be dispatched, but I will coordinate after I go back to see if some workers can be dispatched.

Why, Mr. Su, are we going to have a new project? ”

“good.”

Su Yun pointed to the outside: “I just found out that there are too many employees in the company’s headquarters, and the current headquarters can no longer accommodate so many people.

I came to you to arrange for someone to choose a site at a suitable location, and to establish a new company headquarters as soon as possible. Can you do it? ”

“Guaranteed no problem!”

Zhao QingShan thought for a while, but agreed.

Although the workers under his command are busy now, Zhao Qingshan can mobilize some people from various construction sites. Huayin Company has a large number of workers, and he can pull out a few from various places, and he can also make up a lot of people temporarily.

Moreover, there are always some relatively easy jobs on each construction site. At that time, these jobs can be done by others part-time, but it will be a bit hard.

Fortunately, those workers are willing to work hard, and it should be fine if they are a little tired.

Su Yun smiled indifferently: “That’s good, but we must ensure that the workers are not overworked. If we are too busy, we can suspend some unimportant projects.

In addition, you wait here for a while, and I will draw up a general precautionary plan for you.

As for other aspects, it is up to you to take care of it, so I won’t worry about it. ”

Su Yun said and began to write and draw on the paper.

The construction of the company’s new headquarters is not a trivial matter. Su Yun decided to show the problems that came to his mind in person. After the construction of the province is successful in the future, some current problems will appear again. .

For the new headquarters this time, Su Yun wanted to use the current company’s architectural style as a template and expand it to a larger area on the basis of the original one.

As for how many people can be accommodated, and the detailed layout, it is necessary to make in-depth planning when designing drawings.

From the establishment of the company headquarters to the present, Su Yun has indeed discovered many problems.

Due to the lack of experience in this area at the beginning, the utilization of many venues in the headquarters was not so reasonable, and the placement of many facilities and the planning of the office space also inadvertently wasted a lot of space.

This time, Su Yun will not let these problems continue.

While Su Yun was concentrating on planning, Zhao Qingshan was waiting by the side.

About twenty minutes later, Su Yun raised his head and handed a drafted plan to Zhao Qingshan.

“What you have to do now is to choose a new location for the company’s headquarters and to prepare personnel.

In the site selection, more attention should be paid to the surrounding terrain. In the future, the company will face expansion and the number of employees at the headquarters will increase, so the site selection should be wide.

It doesn’t matter if the surrounding traffic conditions are not good. After the headquarters building is repaired, the infrastructure will be repaired.

The location of the new headquarters should be able to take into account all areas as much as possible. For some of the questions I listed, if there is any uncertainty, please ask me again. ”

Thinking about it now, the current corporate headquarters is indeed a bit cramped.

The current company headquarters covers an area of ​​ten acres, how big is ten acres?

Big! It’s huge!

One mu of land is 666 square meters, and ten mu of land is more than 6,666 square meters. [Looking at the comments earlier, it almost didn’t make me laugh. Some people say what can you do with ten acres of land? His toilets are more than ten acres.

I would like to know, is your house a public toilet? Public toilets can’t be this big! For a public toilet, it is good to have 40 to 50 square meters, and a toilet of more than 6,000 square meters is 980? Gee! 】

But these 6,000 square meters are only the area occupied by the entire company. In addition to the company headquarters building, there are canteens, gyms, cinemas, bars, warehouses of various departments, parking lots, basketball courts, and more.

“Understood, Mr. Su.”

Zhao Qingshan responded. Just as he was about to go out, he suddenly remembered something: “Mr. Su, there is one more thing, when will I come to get the drawings? Are the drawings ready?”

Zhao Qingshan’s construction company, said to be a construction company, is actually a big construction team.

Because Huayin Construction Company does not have the ability to design buildings, there are a bunch of idiots inside.

If you talk about building a small residential house or something, it’s easy, they’re familiar with it, and they don’t need architectural drawings.

But when it comes to real engineering, this requires architectural drawings, which need to be provided by the company headquarters.

Su Yun did not lift his head when he heard the words: “The specific drawings will take a while. You first select the site for the company’s new headquarters. Design drawings will be released after the site has been selected. In addition, there are staff preparations, and arrangements will be made as soon as possible.”

“Okay Mr. Su!”

Zhao Qingshan nodded and left the office with the draft plan.

Su Yun began to think about the next arrangement.

After the new headquarters is established, the current headquarters will definitely be abandoned, but it can’t be abandoned like this. It can be used as a secondary office or temporary storage in the future.

As for the blueprints…

Su Yun thought about it for a long time, but he was hesitating some questions in his heart.

Chapter 362: The Process of Agricultural Mechanization [Part 1]

After thinking about it for a long time, Su Yun had no clue. He could only ask the person who designed the drawings to make improvements based on some unreasonable points at present.

For example, cinemas, stadiums, etc., it is best to set up a separate place, or even farther away from the new headquarters building, and open a separate place to avoid affecting daily work.

But Su Yun didn’t understand engineering design either, so it was difficult for him to determine more details.

“It seems that this kind of thing still needs to find a professional.”

Su Yun smiled bitterly, he was indeed a little powerless in unfamiliar fields.

In the evening, when he returned to the house in Xingdaoli, Su Yun didn’t have time to rest immediately. Tomorrow, representatives of landlords from all over the world were coming over, so Su Yun had to think about it.

These people have different backgrounds, different strengths, and differences in regional cultures.

Previous:

Han Yu: My sister is Mengzhi

Next:

Back to list


Tip: You can use left, right, A and D keyboard keys to browse between chapters.